| Northern approach for Brennero Base Tunnel: Lot H5; 8.4 km m NATM tunnel, 100 m open cut. Geotechnical consulting. Geotechnical documentation, sampling, reporting. Customer: ARGE Tunnel Vomp-Terfens (STRABAG, Hochtief Construction AG, Ed. Züblin AG). |