| Northern approach for Brennero Base Tunnel: Lot H5; 3970 m tunnel in quarternary soils, 1020 m cut and cover, 2520 m cut and cover (socalled "Deckelbauweise") with compressed air, 430 m NATM tunnelling using compressed air and jetgrout roof. Geotechnical consulting. Geotechnical documentations, sampling, reporting. Customer: ARGE Tunnel Fritzens (STRABAG, Hochtief Construction AG, Ed. Züblin AG). |  |